Leave a Message

By providing your contact information to Goldsmith Group Los Cabos, your personal information will be processed in accordance with Goldsmith Group Los Cabos's Privacy Policy. By checking the box(es) below, you consent to receive communications regarding your real estate inquiries and related marketing and promotional updates in the manner selected by you. For SMS text messages, message frequency varies. Message and data rates may apply. You may opt out of receiving further communications from Goldsmith Group Los Cabos at any time. To opt out of receiving SMS text messages, reply STOP to unsubscribe.

Thank you for your message. We will be in touch with you shortly.

Querencia This August: What's Actually Open, What's Just Green, and What's Still a Job Site

August 13, 2026

Querencia This August: What's Actually Open, What's Just Green, and What's Still a Job Site

Stand on the ridge above El Valle right now and you can see three different clocks running at once. To the west, sod has gone down on thirteen fairways and the color is unmistakably golf-course green. Closer to the Clubhouse, machinery is still parked mid-project at the Canyon Club, and the sound of construction carries most mornings. Down at the water, none of that matters. The Beach Club is full, the surf league is running, and dinner reservations are the only real decision left to make.

If you have heard a neighbor say the new course is "almost done" because it looks finished from a distance, or assumed the Canyon Club's bowling lanes must be close because the trampoline park keeps coming up in conversation, this is worth untangling. Not everything new at Querencia arrives on the same timeline, and confusing grassed with open, or announced with built, is the easiest way to plan a season around something that isn't ready yet.

The course is green. That isn't the same as open.

Campo Alto, Tom Fazio's second course at Querencia, has thirteen of its eighteen holes grassed as of this spring's construction reporting, with the final five dramatic finishing holes seeded in May 2026 after a longer stretch of earthwork and shaping. That timeline comes from on-site reporting by Mexico News Daily, which described around 80 workers still active on the property this spring, grading the last holes and installing comfort stations along the routing.

Grass on the ground is not the same as a green ready for a metal spike or a golf cart. Turf needs a grow-in period, root systems have to establish before they can handle daily traffic, and Querencia's own materials point to a grow-in stretch between seeding and the projected late-2026 opening. Practically, that means even though the course looks close to finished from the ridge, nobody inside the gates should expect a tee time on Campo Alto this fall. Late 2026 is still the target, and grow-in is the reason the gap between green and playable is measured in months, not weeks.

The course itself is worth the wait for a specific reason. Fazio designed it as what he calls a "second-shot course," built around smaller, less undulating greens than the original Campo Bajo, with a non-returning routing that threads through canyons and ridgelines rather than repeating the bluff-top style of the first course. As Fazio put it when the project was announced, "As an architect, you never want to repeat yourself, and we haven't here," a line reported by Golf.com when the second course was first unveiled.

One detail residents may not know: neither Querencia course draws on the municipal water supply. The club has an agreement with the city of San José del Cabo to receive treated wastewater, which it filters and recycles as irrigation greywater, and Campo Alto goes a step further by using TifTuf Bermuda, a turf variety developed at the University of Georgia that needs meaningfully less water than the Bermuda strains on Campo Bajo. In a region where OOMSAPAS, the local water utility, has periodically had to ration residential delivery during drought stretches, that is not a minor footnote. It is the reason a second 18-hole course can go in without adding pressure to the same tap everyone else in San José del Cabo is drawing from.

The Canyon Club has two very different sections right now

The Canyon Club is easy to talk about as a single project, but it is really two phases moving at two speeds.

Phase 1 opened in winter 2024 and has been usable for close to two years. It includes the outdoor pump track, sports courts, and skate park, and if your kids or teens have been using those already, that part of the story is finished and has been for a while.

Phase 2 is a different matter. As of reporting earlier this year from Essential Golf, it is still under construction, and the finished version is meant to include an indoor trampoline park, a climbing wall, duckpin bowling lanes, a Ninja Warrior style course, a family pool with a splash zone, a restaurant, and an amphitheater. No completion date has been published alongside those plans. That is worth sitting with for a second, because it means the parts of the Canyon Club that get the most attention in casual conversation, the bowling lanes and the climbing wall, are the parts furthest from being real right now.

Here is where the amenity picture stands this month:

Amenity Status as of August 2026 What it means this week
Beach Club (La Ola, Jorge's, Pop's) Open Full dining rotation and pools, ready to use tonight
Canyon Club Phase 1 (pump track, skate park, sports courts) Open since winter 2024 Fine for a family afternoon right now
Canyon Club Phase 2 (trampoline park, climbing wall, duckpin lanes, family pool, restaurant, amphitheater) Under construction, no completion date announced Not yet, don't plan an event around it
Campo Alto (second Fazio course) 13 of 18 holes grassed, final five seeded this spring Green, not playable, grow-in stands between now and late 2026

There is a related wrinkle worth flagging honestly. Some current property listings for homes near the Canyon Club already describe the on-site market, El Mercado, as open and operating. Querencia's own community materials, by contrast, still describe El Mercado in future tense as part of the still-building Canyon Club complex, alongside the produce stand and juice bar concept. The two descriptions don't fully agree, which is a good reminder that "newly opened" language in marketing copy sometimes moves faster than construction crews do. If a quick grocery run at El Mercado is part of your weekly routine, it is worth confirming what is actually stocked and staffed before you build a plan around it.

What's actually ready right now is at the water

While two major projects are mid-build, the Beach Club has been fully operational for a while, and it is where the real, usable version of Querencia's summer is happening. The dining lineup includes La Ola as the flagship restaurant with both indoor and outdoor seating, Jorge's for sushi and handrolls, and Pop's, a retro-styled dessert shop serving sweet treats and specialty drinks. There is a weekly surf league for members of any level, cabanas along two pools, and a straight line from your terrace to the sand.

That sand happens to sit on Acapulquito, a beach known locally among longboarders as Old Man's. It is a mellow, right-breaking wave over reef and sand, forgiving enough that it is one of the more approachable spots on the corridor for anyone still learning, and summer is generally considered its best season. This week's surf data from Surf-Forecast shows water running around 87 degrees, warmer than typical for early-to-mid August, with a couple of glassy, clean windows on Wednesday and Thursday mornings before conditions turn choppier through the following week. If you have been meaning to get back in the water, this is closer to the right stretch than not.

While the bigger projects finish, the community's Speaker Series has kept running as the connective thread, with past sessions ranging from world politics to the science of aging. It is a small thing, but it is a real one, and it points to the actual shape of a Querencia summer right now: less about the two big builds still underway, more about what is already working while you wait for them.

Knowing which clock you're actually on, the Beach Club's real time, the Canyon Club's slower one, or Campo Alto's grow-in season, is the difference between planning a season around what exists and planning one around what's still framed in construction fencing. Right now, that's mostly the water and the dining room at La Ola. The rest is coming, just not yet.

If you are weighing what any of this means for property values inside the gates, or thinking about how a second course and a finished family hub might change demand once they open, that's a longer conversation, and one Goldsmith Group has close to daily with buyers and owners across the Los Cabos Corridor. Schedule Your Private Los Cabos Consultation whenever you're ready to talk through it.

Work With Us

💬